User manual

86-86000-00 B02 - Page 45
3. Operation
3.0 Scope
Operation describes EX RT 5/7/11 systems characteristics of indicators and controls, modes and specifications
and theory of operating the EX RT 5/7/11. The user procedures include performing software programming that
will maintain smooth performance. Refer to Figure 1.6 for descriptions of circled numbers.
3.1 Initial Startup
NOTE
Both AC and DC sources must be present for normal startup of EX RT 5/7/11
systems. If the system is configured for cold start, the AC and DC sources are
required for initial startup only.
1. Check that the manual bypass switch
7
is on Normal position.
2. Set the Normal AC source circuit breaker
8
to the ON position.
3. Set the battery circuit breaker
14
to the ON position.
The load is powered via the Bypass AC source, but not protected by the UPS.
Batteries are recharging, an eight-hours recharge period is necessary to get full back-up time.
LED
17
is ON.
Figure 3-1: Initial Startup Display.
OFF ON
17