Owner Manual

9 | Page Nova Owner’s Manual | © MF Fire 2017
Standard Installation: Through back wall
Minimum Clearance Requirements
A Side wall to unit
20” (508 mm)
B Back wall to unit
18.5” (305 mm)
G Floor protection, side and back
8” (200 mm)
H Floor protection, front
16” (407 mm)
I Floor protection, chimney connector
2” (51 mm)
Floor protection must be made of a non-combustible material and at
least 0.018” (0.45 mm) thick with a minimum R-value of 0.9
ft2•hr•°F/Btu/in of minimum dimensions 54” x 38.5”. NOTE: This is a
different R-value than the through 90-degree elbow installation.