Instructions / Assembly

(Fig. 9)
(Fig. 10)
STEP 2a
If equipped, remove the existing bottom skid plate from
ATV and retain.
STEP 2b
Attach both adjusting plates to ATV tubular frame using
5/16-18 U-bolt, 5/16"  atwasher and 5/16-18 locknut.
Leave loose, do not tighten at this time. (Figure 9).
STEP 2c
Slide in 1/2-13 x 1-1/2" carriage bolt into both adjusting plates.
Use one of the three slots which will position the carriage bolt 35"
(minimum) from the front of the ATV (Figure 9). Use the carriage
bolts to attach the universal mount to the adjusting plates and
secure using 1/2-13 locknut 28. Do not tighten at this time.
(Figure 10).
STEP 2d
Check to make sure the 35” (minimum) dimension is achieved
and that the universal mount is square and centered in relation
to the front of the vehicle and tighten all fasteners. (Figure 11).
STEP 2:
MOUNT ASSEMBLY
7
(Fig. 11)
Bolt Nut Size Gr. Gr. Gr.
2 5 8
1/4 - 20 4 - 5
5/16 - 18 9 - 11
3/8 - 16 17 - 20 26 - 29
66 - 0664 - 2441 - 61/7
001 - 0927 - 4631- 2/1
- 72111 - 8/5 141 179 - 198
TORQUE CHART FOOT
35"
22, 23
7, 11
SAFETY PRECAUTIONS -
See pages 2-3 for de nitions