Product Manual

Installation and Operational Manual
00122-993-01 June 8, 2010
8
DUAL FLOW CONTROL VALVE
INSTALLATION INSTRUCTIONS
1. IMPORTANT: A pipe joint sealant
compatible with hydraulic oil must be
applied to all screwed fittings. (Teflon
Tape Sealant is Not Recommended)
2. Hose ends connected to valve must
be of the “swivel” type.
3. CAUTION: Overtightening of the
fittings in flow valve may cause
damage to valve body.
4. Approximately 8” of hose slack must be
allowed between the valve and the
valve stand after the valve has been
completely plumbed. If this condition
does not exist after the plumbing has
been completed, removal of valve will
require hoses to be removed at opposite
end of hoses.
5. Assembly of valve on stand:
a. Cut a 5” x 5” square opening in floor
of truck where the valve stand is to
be located.
b. Bolt valve stand halves together
forming a box over the 5 x 5
square opening. NOTE: When
bolting valve stand halves in place,
make sure holes in flanges of halves
align with holes in flange plate.
c. Bolt flange plate to VALVE.
(Use (2) 1/4” x 3” bolts, lockwashers,
and nuts.)
d. Insert hoses through floor opening
and valve stand and connect appro-
priate hoses to valve. (See
instruction #1 thru #4.)
e. Bolt flange plate to valve stand flanges.
(See page 37 for parts list.)
VALVE