Product Manual
Installation and Operational Manual
00122-993-01 June 8, 2010
13
INSTALLATION OF SPINNER ASSEMBLIES ON
“S” SERIES SPREADERS
(Continued)
3. Position spinner linkage bar under spinner frame channel so that L-Bend aligns with truck
frame. Secure linkage bar to spinner frame with 5/16” X 1” bolt and flange nut, using the
inside mounting hole. (Outside mounting hole is for hydraulic hose clamp.) Cut off any
excess linkage bar if required.
4. With spinner disc level with ground, measure and record the distance between
centerline of spinner hinge rod(s) and centerline of hole in spinner linkage bar(s)
for dimension “X”. Measure and record the space between centerline of dump body hinge
pins and centerline of spinner hinge rod(s) for dimension “Y”.
DIMENSION “X” ___________________
DIMENSION “Y” ___________________
5. Temporarily clamp frame bar(s) in position (hole pointing down) against truck frame.
Locate mounting hole below dump body hinge pins using “X” and “Y” dimensions from
step 5.
6. Attach parallel linkage rods to the frame bars and in the spinner linkage bar(s)
with 1/2” flatwasher and keeper pins. Overlap and temporarily clamp rods together.
7. Raise and lower dump body while checking spinner for binding and level
operation at all dump angles. Check that temporary connection bars are not moving.
8. Secure frame bar(s) to truck frame in compliance with truck manufactures recommenda-
tions. Weld parallel linkage rod together. Remove all temporary clamps.
9. Attach spinner hydraulic hoses to spinner motor (use pipe thread sealant if applicable).
Secure hoses to spinner frame with clamp and hardware provided.