Operating instructions
8
Inserting the spacer bolt
Prepare spacer bolt (1):
The spacer bolt must have a length of approx. 66 mm. If the bolt is shorter:
• Hold knurled nut (2) and loosen the lower half (3) by turning counterclockwise.
•When the bolt is the required length, screw knurled nut (2) to lower half (3).
•Mount spacer bolt (1) with taper leading on conical spigot of the balance.
•Mount draft shield (5) on the three centering pegs (6). Ensure that spacer bolt (1) slides onto
centering peg (7).
• Insert pan support (8) in draft shield (5) and press downward gently.
Attaching the cables
• Attach the short connection cable (9) enclosed with the accessories to socket (10) of the
balance and to socket (11) of the dryer.
• Connect drying unit and balance to the power supply.
If a LC-P45 Printer or a GA37 Digital/Analog Converter is attached:
• Attach connection cable (14) from the accessories of the printer or digital/analog converter to
socket (15) of the dryer and to the appropriate socket of the LC-P45 or GA37.
• Turn on power switch (16).
• Switch on balance using the tare bar.
The flashing lamp of the START key at the front of the dryer signals operational readiness.
1
4
32
8
5
7
1
6
11
10
15
914
12
16
13
STOP
START
ATRO
0.....
999%
ATRO
100......
999%










