User guide
7.3 Method setup
IC Net 2.3
277
Optimize your analysis first to get stable
measuring conditions without a retention
time drift. In any case it is better to have
stable conditions, use this feature only as
a last possibility.
Calibration If checked, the retention times will be up-
dated in the peak table after every calibra-
tion.
All If checked, the retention times will be up-
dated in the peak table after every determi-
nation.
Show all If checked, scales on X and Y axes will be
automatically chosen so that the recorded
chromatogram fits the window.
Make report If checked, report auto-printing will be per-
formed on data acquisition ending.
Close window If checked, the window is closed automati-
cally after the run (or sample queue) is fin-
ished.
Chromatogram directory
Directory where the current chromatogram
is saved. Use the <Browse> button to select
a new directory.
Program before Name and path of the program to be
started automatically before the run is
started.
Program after Name and path of the program to be
started automatically after the run is fin-
ished.