Owner's manual

2 Installation
797 VA Computrace / Hardware-Manual 8.797.8001EN
18
1 Fill gas wash bottle
Unscrew gas wash bottle 6 from measuring head arm 23.
Fill gas wash bottle half full with dist. H
2
O (for long-term measurements
with supporting electrolytes such as Acetic acid / Acetate buffer or Ammo-
nia / Ammonium chloride buffer, fill with supporting electrolyte; for meas-
urements in organic solvents fill with the used solvent).
Screw gas wash bottle back on measuring head arm.
2 Connect inert gas supply
Attach one end of 6.1801.080 PVC tubing to connection 11 of the 797 VA
Computrace Stand.
Attach the other end of the 6.1801.080 PVC tubing to connection of the
inert gas bottle.
Set inert gas pressure at gas bottle using the reducing valve to
p = 1 ± 0.2 bar.
Open gas supply line at gas bottle.
3 Connect inert gas lead-off (option)
Attach a length of suitable tubing (e.g. Metrohm 6.1805.030, length
150 cm) to connection
9 for inert gas lead-off.
Route the other end of the lead-off tubing to a fume cupboard.