Instruction Manual
3 General settings for exploratory and determination mode
797 VA Computrace – Software
60
* CV and CVS: Voltage step time = Voltage step / Sweep rate
** SqW: Voltage step time = 1 / Frequency
3.4 General operation sequence
Overview of operation sequence
The general operation sequence for measurements is identical for
both the exploratory and the determination mode and includes the
following steps:
1. Electrode test
Testing of the electrodes (only for oerating mode «Determina-
tion»).
2. Stirring
Optional stirring of the sample solution during preparation pro-
cedures until start of the equilibration time (details see Stirring).
3. Purging
Optional purging of the sample solution during the Initial purge
time
(details see Purging).
4. Drop formation
Hg drop formation at the MME if
DME, SMDE or HMDE is se-
lected (details see section 3.1).
5. Conditioning cycles
Optional conditioning of solid state electrodes by applying cy-
clic conditioning sweeps (details see Conditioning of solid state
electrodes).
6. Cleaning
Optional cleaning of solid state electrodes by applying a clean-
ing potential during the Cleaning time (details see
Pretreatment).
7. Deposition
Optional electrochemical deposition for stripping voltammetry
during the
Deposition time (details see Pretreatment).
8. Equilibration time
Waiting time before starting the sweep; with start potential
applied to the electrodes. If the checkbox
Hydrodynamic (meas-
Current range Voltage step time
10 nA > 50 ms
100 nA > 5 ms
1 μA
> 0.5 ms
10 μA
> 0.5 ms
100 μA
> 0.5 ms
1 mA > 0.5 ms
10 mA > 0.5 ms