User guide

2.3 Attaching the accessories
788 IC Filtration Sample Processor
13
2.3.4 Installing the splash protection
To avoid any danger of injury by the needle, the 6.2751.040 splash
protection must always be installed when operating the 788 IC
Filtration Sample Processor!
1 Remove holding screws
Remove the holding screws
37
3737
37
and the washer mounted on the
screw threads
12
1212
12
at tower
27
2727
27
using the 6.2621.100 Allen key.
2 Remove protective film from splash protection
Remove the plastic film glued on both sides of the splash
protection
1
11
1
.
3 Install splash protection
Attach splash protection onto the screw threads at the tower and
fix it with the holding screws and the washer using the
6.2621.100 Allen key.
37
3737
37
37
3737
37
1
11
1
Fig. 5
: Installing the splash protection
2.3.5 Installing the needle or tubing
1 Remove PEEK compression fitting 5
Remove PEEK compression fitting
5
55
5
screwed onto the needle
holder
4
44
4
.
2 Insert needle
Insert needle
2
22
2
(6.1835.010) PEEK needle or 6.1835.020 PEEK
tubing) completely into the opening of the needle holder
4
44
4
.
3 Fix needle or tubing
Tighten compression fitting
5
55
5
in needle holder
4
44
4
by hand
(never
use tools!).
1
11
1
Splash protection
(6.2751.040)
37
3737
37
Holding screws