Manual

3 «IC Net»
761 SD Compact IC / Instructions for Use 8.761.1043
54
3.2 Systems supplied
3.2.1 System "startup.smt"
System startup.smt is used to run the instrument in before the actual
measurements. It must be run after long interruptions in measurement
(for example overnight) at the start of the measurements and has a
program runtime of 30 minutes.
System window
System parameters
Control tab
Same settings as in the example with the
manual.smt system in Section
3.1.6.
Program tab
Time program of the
startup.smt system.