Owner manual

2.9 Putting into operation
761 Compact IC
47
parameters.
3 Start system
Make sure, that the aspirating tubing 63 for the high-pressure
pump is immersed in the eluent.
Select
Startup determination from the Control menu in the
system window. The high-pressure pump and the peristaltic
pump are started, at the same time, a chromatogram window
is opened where the baseline is recorded continuously. The
suppressor module is automatically switched to the next posi-
tion every 20 min and conditioned in this way.
4 Set contact pressure for pump tubings
Press contact pressure lever 49 on both tubing cartridges 48
upwards until regeneration and rinsing solution just start to be
drawn in.
Then press contact pressure lever 49 upwards until it clicks
once more to obtain optimal contact pressure.
5 Check for leaks
Check all capillaries and their connections between the high-
pressure pump and the detector block for escaping liquid. If
eluent escapes anywhere, the appropriate compression fitting
must be tightened further or changed.