Owner manual

7.7 Standard operating procedure in the context of GLP/ISO 9001 guidelines
746 VA Trace Analyzer / 747 VA Stand
7-59
5
Testing the stirrer
Press the softkey <Stirrer> several times and check the on/off switch-
ing of the stirrer motor.
6
Copying the TEST747.mth method to the working storage
Press the yellow <METHODS> key.
Use the cursor keys to select the TEST747.mth method.
Press the softkey <Copy to> and then <Working storage>.
7
Entry of the sample volume
Press the yellow <MONITORING> key.
Use the cursor keys to select the parameter Sample size/S0.
Press the <CLEAR> key.
Enter <*> and press <ENTER>.
8
Start program
Press the <START> key.
Attach the electrode cable as described in the instructions on the screen
to the clamping screws of the dummy cell.
9
Assessment of the linearity
The first of the printed curves should satisfy the following conditions:
In principle, the plotted diagonal must be straight. Small deviations
are partly due to the resolution of the printer.
Current at voltage 200 mV: 1.6 µA ... 2.4 µA*
Current at voltage +200 mV: +1.6 µA ... +2.4 µA*
* These tolerance values refer to illustrative scatters, that is to the differences
between individual instruments. The value determined for a specific instrument
shows less scatter. The deviation depends mainly on the temperature and should
be around 10%.
10
Assessment of peak measurement
The second curve plot should satisfy the following conditions:
A symmetrical, gaussian-shaped peak should be plotted. The
evaluation must provide a result for the peak voltage U
and the peak
current I, which are printed out at the end of the curve.
Peak voltage U : 450 mV ... 550 mV