Owner manual

4 Introduction to the operation
746 VA Trace Analyzer / 747 VA Stand
4-44
Method: INTSTD .mth OPERATION SEQUENCE
Title : Pb determination with internal standard (Cd)
Instructions t/s Main parameters Auxiliary parameters
ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ ÄÄÄÄÄÄÄÄÄÄ ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ
1 D SMPL>M V.fraction mL V.total L
2 C (CAL
3 C CSOLN>M addition into MEAS
4 DOS>M Soln.name Acetate V.add 1.000 mL
5 RADD>M Soln.name CdRefSol V.add 0.100 mL
6 PURGE
7 STIR 180.0 Rot.speed 2000 /min
8 ØPURGE
9 (REP
10 STIR 5.0 Rot.speed 2000 /min
11 SEGMENT Segm.name DPASV
12 REP)2
13 C RINSE Cycles 1 V.rinse mL
14 C CAL)3
15 END
Modify
column
Modify
line
Delete
instr.
Insert
instr.
Method
labels
The following is a brief explanation of the main program sequence:
Line 1 Addition of sample: 10 mL
Line 2 14 Loop for recording the calibration curve (4 calibration solutions)
Line 3 Addition of calibration solution to measuring vessel: 10 mL
Line 4 Addition of acetate buffer to measuring vessel: 1 mL
Line 5 Addition of the internal standard to the measuring vessel:
0.1 mL Cd standard solution 1 mg/L
Line 6 7 Purging and stirring of the analysis solution for 3 min
Line 8 Switching off the purging
Line 9 12 Loop for double replication of the segment
Line 10 Stirring of the analysis solution for 5 s
Line 11 Call-up of the segment DPASV for lead determination
Line 13 Resetting of the volume bookkeeping to 0 for solution change
(new calibration solution)
Line 15 End of main program
The sequence of the main program depends on the selected mode for
the program run Run mode on the "MONITORING" page:
In the program run mode calibration, all instructions marked with
D are ignored. Internal standard is added to 4 calibration solutions in
turn and lead and cadmium measured each time. The proportional-
ity factor between lead and cadmium is determined from the re-
corded calibration curve.
In the program run mode determination, on the other hand, all in-
structions marked with C are ignored. Internal standard is added to
the sample and then lead and cadmium measured. The lead mass
concentration is calculated using the proportionality factor deter-
mined beforehand.