User guide

6 Installation Guide
1
Installation Guide
Follow the simple steps outlined in this section to install and start using the
Radiance R400 Premise Service Platform.
NOTE: Electrostatic discharge precautions should be taken when handling any
line card. Proper grounding is recommended (i.e., wear a wrist strap).
Unpack the Platform and Accessories
Check that the following components have been included:
Radiance R400 Premise Service Platform
1 AC power supply
1 power cord
4 rubber feet
The following items are available separately:
AC power supply
Management card
NetBeacon element management software
Radiance line cards
Your order has been provided with the safest possible packaging, but
shipping damage does occasionally occur. Inspect it carefully. If you
discover any shipping damage, notify the carrier and follow their
instructions for damage and claims. Save the original shipping carton if
return or storage of the unit is necessary.