Installation Guide

2
EATON IB519034EN Installation instructions
Installation Instructions – Cruze LED Retrofit Kit
Installation Steps
1. Turn power off and remove door, baffle or other cover.
2. Remove fluorescent tubes, wireway cover or enclosure
as needed for space.
3. Disconnect host ballast from main supply wire and
remove ballast.
4. Install End Plates (A) between luminaire housing and
T-grid.
5. Slide End Plates (A) outwards as far as possible.
6. Install Main Panel (D) between luminaire housing and
T-grid. Make sure the tabs at each corner of the Main
Panel slide into each slot on the End Plates (A).
A
A
D
A
A
A