Instructions / Assembly
INSTALLATION NOTES: INSTALLATION OF YOUR LATTICE PATIO
COVER WILL BE SIMPLIFIED IF IT IS ASSEMBLED IN THE FOLLOWING ORDER.
READ ALL INSTALLATION INSTRUCTIONS AND FAMILIARIZE YOURSELF
WITH ALL THE PARTS & PIECES BEFORE GETTING STARTED.
METHOD #1: INSTALLING A LEDGER BOARD KIT AT HOUSE WALL USING
5/16” X 5-1/2” HEX HEAD LAG SCREWS AT EACH STUD LOCATION @ 16” ON
CENTER.
METHOD #2: ATTACHING DIRECTLY TO EXISTING FASCIA BOARD:
ANGLE BRACKETS MUST BE INSTALLED AT EACH EXISTING EAVE RAFTER TO
FASCIA BOARD. LATTICE RAFTERS MAY NEED TO BE CUT AT A SLIGHT ANGLE TO
COMPENSATE THE EXISTING ANGLE ON FASCIA.
THERE ARE TWO BASIC METHODS FOR ATTACHING
YOUR LATTICE PATIO COVER
RECOMMENDED TOOLS:
* 6’ OR 8’ STEP LADDER
* 3/8” VARIABLE SPEED DRILL
* HACKSAW OR CIRCULAR SAW
WITH FINE TOOTH BLADE
* EXTENSION CORD
* LEVEL
* CARPENTERS SQUARE
* 25’ TAPE MEASURE
* CHALK LINE
* HAMMER
* ADJUSTABLE WRENCH
* DRIVER / DRILL BIT PKG.
(INCLUDED WITH KIT)
1/4”,5/16”,3/8”-3/8” MASONRY,5/8” SPADE BIT