Installation Guide

Press to turn on ozone sterilization function, press this button
again or after 10 minutes lasting work, then ozone sterilization will be
turn off. Other functions cannot be turn on when ozone sterilization be
turn on because of other functions be locked by each other except ozone
sterilization and lighting.
It is best to turn on ozone sterilization after taking the
shower.
Press to turn on exhaust fan,there showing exhaust fan's logo on
the screen, press this button again to turn off.
Call: press then press telephone numbers, there showing those
numbers what you've dialed on the screen, you can speaking towards to
the microphone when get through phone calls. Press to up
and down the volume.
Pick up phone call: when telephone ringing, press to pick up.
Hang up phone call: Press to hang up phone calls after finished
conversation.
Press into FM Radio function, sounds come from speaker.Press
to search channel by manual acting, press half second
then that is channel searching automatically. Press again to turn
off FM.
0
C
0
C
0
C
STST
MHzMHz
0
C
1.The products should be installed by technical guy who are got
the certificate or those technical who are assign by dealers. The
main power switch and electronic leakage device should be
installed.
2.The plug of electronic should be installed above the steam
generator and the length of electronic wire not less then
1800MM from the earth.
3.There are should be with main power switch for hot and cold
water pipe of steam room and the water pipe should be connect
to drainage water pipe.
4.Install the products according to the diagram of installation
When fixed the place for the products.
STEP 2
STEP 1