User's Manual
Table Of Contents
- Meru Networks OAP832e Installation Guide
- Table of Contents
- About OAP832e
- Installing OAP832e
- Approved Antennas
- Regulatory Information
- Additional Notes
- Cautions and Warnings
Air Handling Space Requirements34
Air Handling Space Requirements
When installing APs in an air-handling space, as described in Article 300.22(C) of the National
Electric CodeĀ® (2008 edition, pages 70-135 and 70-136), the unit should only be powered by
the Ethernet port (PoE), not by the AC-powered power supply.
Only OAP832e with plastic facade removed can be applied in air-handling space.
When the product is installed in air-handling spaces, the cables employed should be suitable
under NEC Articles 300.22 and 725 and marked accordingly, for use in plenum and air-han-
dling spaces with regard to smoke propagation, such as CL2-P, CL3-P, MPP or CMP.
The products should be installed in accordance with all applicable, local regulations and prac-
tices. Compliance applies only when the plastic facade is removed from the AP.
Frequencies Blocked for Regulatory
Compliance
To ensure compliance with local regulations, be sure to set your Access Point to the country in
which you are using the Access Point.
Underwriters Laboratories
Suitable for use in environmental air space in accordance with Section 300-22(c) of the
National Electrical Code, and Sections 2-128, 12-010(3) and 12-100 of the Canadian Electri-
cal Code, Part 1, C22.1.
Restriction of Hazardous Substances
European Community
This device complies the Restriction of Hazardous Substances Directive (RoHS) for its restric-
tion of the use of certain hazardous substances in electrical and electronic equipment for
European Union.










