User's Manual

Table Of Contents
xlvi Meru Access Point Installation Guide © 2013 Meru Networks, Inc.
AP Plenum Requirements
AP Plenum Requirements
When installing APs in an air-handling space, as described in Article 300.22(C) of the
NEC (2005), the unit should only be powered by the Ethernet port (PoE), not by the
AC-powered power supply.
When the product is installed in air-handling spaces, the cables employed should be
suitable under NEC Articles 300.22 and 725 and marked accordingly, for use in
plenums and air-handling spaces with regard to smoke propagation, such as CL2-P,
C L 3 - P, M P P o r C M P.
The products should be installed in accordance with all applicable, local regulations
and practices.
Manufacturers Federal Communication Commission Declaration of
Conformity Statement
Manufacturer:
Meru Networks, Inc
894 Ross drive,
Sunnyvale, CA 94089
USA
This device complies with Part 15 rules. Operation is subject to the following two
conditions:
4. This device may not cause harmful interference, and
5. This device must accept any interference received, including interference that
may cause undesired operation.
Access Point Models Certification Number
AP832e
AP832i