User's Manual
Table Of Contents
- About This Guide
- Access Points
- Installing AP300
- Safety Precautions
- Best Practices for an AP300/AP200 Network
- Unpack the AP300
- Determine Power Requirements
- Installation Requirements
- Install the AP300
- Select a Location
- Attach the Provided Antennas
- Install the Remote Antenna Mount (optional)
- Install External ACC-ANT-MIMO-MNT Antenna with Three Connectors (optional)
- Install Remote ACC-ANT-6ABGN-24 Antenna with Six Connectors (optional)
- Install Antennas With One Connector (optional)
- Install the Access Point
- Check AP300 LED Activity
- Where to Go From Here
- Installing AP320i
- Installing AP200
- Installing AP150
- Installing OAP180
- Cautions and Warnings
- Regulatory Information
Where to Go From Here
© 2010 Meru Networks, Inc. Installing AP320i 51
Where to Go From Here
Now that the AP320i is installed, go to the Meru System Director Getting Started Guide for instructions
on initializing the hardware. Return to this chapter to check the status of the LEDs once the WLAN is
operational.