User's Manual
Table Of Contents
- About This Guide
- Access Points
- Installing AP300
- Safety Precautions
- Best Practices for an AP300/AP200 Network
- Unpack the AP300
- Determine Power Requirements
- Installation Requirements
- Install the AP300
- Select a Location
- Attach the Provided Antennas
- Install the Remote Antenna Mount (optional)
- Install External ACC-ANT-MIMO-MNT Antenna with Three Connectors (optional)
- Install Remote ACC-ANT-6ABGN-24 Antenna with Six Connectors (optional)
- Install Antennas With One Connector (optional)
- Install the Access Point
- Check AP300 LED Activity
- Where to Go From Here
- Installing AP320i
- Installing AP200
- Installing AP150
- Installing OAP180
- Cautions and Warnings
- Regulatory Information
120 Meru Access Point Installation Guide © 2010 Meru Networks, Inc.
AP300 Plenum Requirements
AP300 Plenum Requirements
When installing the product in an air-handling space, as described in Article
300.22(C) of the NEC (2005), the unit should only be powered by the Ethernet port
(PoE), not by the AC-powered power supply.
When the product is installed in air-handling spaces, the cables employed should be
suitable under NEC Articles 300.22 and 725 and marked accordingly, for use in
plenums and air-handling spaces with regard to smoke propagation, such as CL2-P,
C L 3 - P, M P P o r C M P.
The products should be installed in accordance with all applicable, local regulations
and practices.