User's Manual
Table Of Contents
- About This Guide
- Access Points
- Installing AP300
- Safety Precautions
- Best Practices for an AP300/AP200 Network
- Unpack the AP300
- Determine Power Requirements
- Installation Requirements
- Install the AP300
- Select a Location
- Attach the Provided Antennas
- Install the Remote Antenna Mount (optional)
- Install External ACC-ANT-MIMO-MNT Antenna with Three Connectors (optional)
- Install Remote ACC-ANT-6ABGN-24 Antenna with Six Connectors (optional)
- Install Antennas With One Connector (optional)
- Install the Access Point
- Check AP300 LED Activity
- Where to Go From Here
- Installing AP320i
- Installing AP200
- Installing AP150
- Installing OAP180
- Cautions and Warnings
- Regulatory Information
Where to Go From Here
© 2010 Meru Networks, Inc. Installing OAP180 99
Where to Go From Here
Now that the AP300 is installed, go to the Meru System Director Getting Started
Guide for instructions on initializing the hardware. Return to this chapter to check
the status of the LEDs once the WLAN is operational.
As well, check the AP chapter in the Meru System Director Configuration Guide for
instructions on configuring radio band, dual radio, and external antenna operation.