User's Manual
Table Of Contents
- Contents
- About This Guide
- AP300 Series Introduction
- Installing the AP300
- AP300 Brackets
- Specifications
- Regulatory Information
- Channels

6 Meru AP300 Guide © 2007 Meru Networks, Inc.
Installation Requirements
Figure 3: AP300 Bottom View
An array of holes on the mounting bracket allows the AP300 to be mounted on the wall and
over junction boxes or molly bolts. There are holes for passing the PoE Ethernet or external
power supply cable through the bracket if the bracket is mounted on a junction box.
To complete this installation, you need the items listed in
Table 3.
Table 3: AP300 Installation Items
Installation Type Consumable Items Required
Horizontal mounting None
Vertical mounting over a wall stud
z Two #6 x 2" wood screws for a wood stud; or
z Two #6 x 1½" metal screws for a metal stud
z Mounting bracket
Vertical mounting on sheetrock
z Two #6 x 1" screws
z Two #4-6 x 7/8" ribbed plastic wall anchors
z Mounting bracket
Horizontal mounting below a hang-
ing ceiling
z Two caddy fasteners
z Two plastic spacers
z Two keps nuts (with attached lock washer)
z Mounting bracket
Using existing Cisco 1230 series
brackets
z special screws - see Appendix A
A
5
A
6
5V DC
CON LAN
00209
Ethernet
port
serial
port
power
lock
reset