User's Manual
Table Of Contents
- Contents
- List of Figures
- List of Tables
- About This Guide
- About Meru Access Points
- Installing the AP200
- Installing the AP150
- Specifications
- Regulatory Information
- Translated Safety Warnings
- Channels
18 Meru Access Point Installation Guide
Installing the Access Point
.
Figure 13: Attaching the Mounting Bracket to the Box Hanger
5. Pass the long end clip through the large center hole to the underside of the the mounting bracket
clip and then attach the bracket to the clip using the supplied screw (see Figure 13 for
orientation).
6. Hold the AP200 next to the mounting bracket to estimate the height of the T-bar box hanger to
provide enough clearance for the external antennas, which should be pointing down.
7. Adjust the height of the box hanger using the height adjusting screws (see Figure 10).
8. Clip the box hanger T-rail clips to the ceiling rails, making sure they are securely attached.
9. Connect a drop wire to a building structural element and through the hold provided in the bracket
mounting clip. The U.S. National Electrical Safety Code requires this additional support.
10. Connect the posts of the AP200 to the three keyholes of the mounting bracket and slide into the
keyhole (see Figure 9), ensuring the locking detent is engaged. You will hear a click.
11. For each antenna, loosen the knurled ring at the base of the antenna (see Figure 5), point the
antenna down, then retighten the ring.
12. Connect one end of the PoE 100BaseT Ethernet cable to the 100/1000 Ethernet connector, shown
in Figure 6.
13. Check that the AP200 is operating correctly before replacing the ceiling tile to the ceiling. Verify
correct operating using the LEDs, as shown in the next section.
00104
Caution!
Be sure to connect the Ethernet cable to the Ethernet port; the cable can mistakenly be
plugged into the Console port.