Installation guide

Safety Precautions
© 2009 Meru Networks, Inc.Installing the OAP180 55
Chapter 5
Installing the OAP180
This chapter describes how to physically install the OAP180. It contains the following
sections:
z Safety Precautions
z Unpacking the OAP180
z Installation Requirements
z Installing the Access Points
z Where to Go From Here
z Checking LED Activity
Safety Precautions
IMPORTANTRead and follow the instructions in Appendix , “Regulatory Information”
on page 93 before installing and operating this product.
This product is intended to be powered by a UL Listed power supply, marked Class 2
or LPS, and rated minimum 5 Vdc, 3A.
Caution!
The OAP180 is not certified for plenum installations, and should not be
installed in the plenum space.