Installation guide
Safety Precautions
© 2009 Meru Networks, Inc.Installing the AP150 41
Chapter 4
Installing the AP150
This chapter describes how to physically install the AP150. It contains the following
sections:
z Safety Precautions
z Unpacking the AP150
z Installation Requirements
z Installing the Access Points
z Where to Go From Here
z Checking LED Activity
Safety Precautions
IMPORTANT—Read and follow the instructions in Appendix , “Regulatory Information”
on page 93 before installing and operating this product.
This product is intended to be supplied by a UL Listed power supply, marked Class 2
or LPS, and rated minimum 5 Vdc, 3A.
Unpacking the AP150
Confirm that the AP150 shipping package contains the AP150 access point with
attached mounting bracket.
Caution!
The AP150 is not certified for plenum installations, and should not be installed
in the plenum space.