User Instructions Part 1
INSTALLATION INSTRUCTIONS FOR OEM USE ONLY
© 2013 Mertik Maxitrol GmbH & Co. KG, All Rights Reserved.
9 / 28
Figure 12
▪ A 2
nd
thermocouple is placed in the main burner to check that the main gas is ignited within a certain time after opening.
▪ The voltage will be measured T1 (22 sec) after the motor has turned in high fi re direction (after ignition and after increasing fl ame height).
▪ If the voltage is lower than 1.8 mV, the electronics shut off the gas completely.
▪ A new start is blocked for T2, which is 2 minutes after ignition failure and 1 minute after failure while opening main gas.
▪ Receivers for 2
nd
thermocouple are identifi ed with a yellow sticker on the back. They will not operate without the thermocouple connected.
Other versions will not operate if the thermocouple is connected.
▪ The 2
nd
thermocouple function is certifi ed as safety level “B” according to EN 13611.
▪ To use Wall Switch, Switch Panel or External Operation Cable, the additional cable G60-ZCTCR/2000 is needed.
Installation steps
1. Remove cable G60-ZCTC/2000 and replace with cable G60-ZCTCR/2000.
2. Insert the Molex crimp terminal into the open connector hole of the plug. Listen for a "click".
3. Insert the insulated receptacle into the insulated 2nd thermocouple terminal.
4. Insert the plug connector into the receiver (see fi gure 2).
NOTICE
To connect the 2
nd
thermocouple make sure that the insulated connector
is connected to the con-
nection cable. The non-insulated connector
must be connected to the ground cable.
RF 2
ND
THERMOCOUPLE OPTION
2
nd
thermocouple
Receiver
G6R-R3(4)AUT
G6R-R3(4)AKT
G6R-R3(4)UT
G6R-R3(4)KT
Main Burner
Cable for 2
nd
thermocouple
(insulated)
G60-ZCTCR / 2000 or
G60-ZCTC / 2000
Ground cable
(non-uninsulated)
GV60 valve
insulated
non-insulated