User Instructions Part 1

INSTALLATION INSTRUCTIONS FOR OEM USE ONLY
© 2013 Mertik Maxitrol GmbH & Co. KG, All Rights Reserved.
9 / 28
Figure 12
A 2
nd
thermocouple is placed in the main burner to check that the main gas is ignited within a certain time after opening.
The voltage will be measured T1 (22 sec) after the motor has turned in high fi re direction (after ignition and after increasing fl ame height).
If the voltage is lower than 1.8 mV, the electronics shut off the gas completely.
A new start is blocked for T2, which is 2 minutes after ignition failure and 1 minute after failure while opening main gas.
Receivers for 2
nd
thermocouple are identifi ed with a yellow sticker on the back. They will not operate without the thermocouple connected.
Other versions will not operate if the thermocouple is connected.
The 2
nd
thermocouple function is certifi ed as safety level “B” according to EN 13611.
To use Wall Switch, Switch Panel or External Operation Cable, the additional cable G60-ZCTCR/2000 is needed.
Installation steps
1. Remove cable G60-ZCTC/2000 and replace with cable G60-ZCTCR/2000.
2. Insert the Molex crimp terminal into the open connector hole of the plug. Listen for a "click".
3. Insert the insulated receptacle into the insulated 2nd thermocouple terminal.
4. Insert the plug connector into the receiver (see fi gure 2).
NOTICE
To connect the 2
nd
thermocouple make sure that the insulated connector
is connected to the con-
nection cable. The non-insulated connector
must be connected to the ground cable.
RF 2
ND
THERMOCOUPLE OPTION
2
nd
thermocouple
Receiver
G6R-R3(4)AUT
G6R-R3(4)AKT
G6R-R3(4)UT
G6R-R3(4)KT
Main Burner
Cable for 2
nd
thermocouple
(insulated)
G60-ZCTCR / 2000 or
G60-ZCTC / 2000
Ground cable
(non-uninsulated)
GV60 valve
insulated
non-insulated