User Instructions Part 1
INSTALLATION INSTRUCTIONS FOR OEM USE ONLY
© 2013 Mertik Maxitrol GmbH & Co. KG, All Rights Reserved.
10 / 28
ON-OFF
UP
DOWN
Relay with Cable
G6R-CD... (50 V/ 0.6 A)
G6R-CDB (240 V/5 A)
START
IN
Pilot Burner
Solenoid Valve
(Required for Power
Flue Control)
Wall Switch
(Optional)
Power Flue Control
(Optional)
Receiver
B6R-R9(8)K...
with handset
L6R-H8,9TV4
Thermocurrent Cable SW
with ON/OFF Switch
Thermocurrent Cable TC
8 Wire Cable
Interrupter Block
Ignition Cable
COMBINATION RECIVER FOR POWER FLUE CONTROL AND AUX
Relay with Cable
G6R-CL... (50 V/ 0.6 A)
G6R-CPB (240 V/5 A)
GV60 Valve
For cable G6R- CPB
strain relief required,
min. 30 N (to be mounted by
installer)
Auxiliary contact
to switch ON/OFF
an electrical load
Main Burner
For cable G6R- CDB
strain relief required,
min. 30 N (to be moun-
ted by installer)
Also for Latching
Solenoid Valve (AUX),
see fi gure 11, page 8
Power Flue Control
The B6R activates and deactivates an external electronic control (not available from Mertik
Maxitrol). The fl ue electronic control starts automatically with ignition. The fl ue electronic control is
deactivated if the GV60 is shut off or if the motor turns to pilot end-stop. The control starts again
when the motor leaves the pilot end-stop. The external power fl ue control operates a fan and a
solenoid valve. A pressure switch checks the draft. If there is the required draft the solenoid valves
opens. For safety, the solenoid valve must close in case of a power outage. The solenoid valve
should be installed between the GV60 and the main burner. (A pilot gas position is not possible
upstream of the valve.)
Solenoid Valve
(Required for Power
Flue Control)
Main Burner