Specifications

WARNING
If at any time the 690 coupling is bound up (jack-
knifed), the 294 bolt MUST be replaced immedi-
ately! Do not use the coupling until the bolt has
been replaced. In addition, carefully inspect the
690 coupling, drawbar, drawbar eye, front end as-
sembly, and tail board for damage. Failure to do
so may result in trailer separation from the truck
while in use, resulting in serious personal injury
or property damage.
The time-in-service of the 294 bolt located in the 690
coupling must be monitored, and maintenance per-
formed as follows. See
Fig. 14.
For a new or replaced 294 bolt:
Record the date of installation.
6 months after installation date:
Remove the 294 bolt. Using dye penetrate or
magnetic particle testing along the length of the
bolt, inspect for fractures.
If the 294 bolt has no damage, install it and
continue to use for another 6 months.
If the 294 bolt is fractured, DO NOT USE. Con-
tact Premier Mfg. Co.
1 year after installation date:
Regardless of service duty, replace the 294 bolt
with a new one.
1
2
3
f310313a
07/13/2010
4
1. Linch Pin
2. Handle
3. Pintle Hook
4. 294 Bolt
Fig. 14, Premier 690 Trailer Coupling
Frame and Frame Components31
Century Class Trucks Maintenance Manual, August 201131/10