Specifications
WARNING
If at any time the 690 coupling is bound up (jack-
knifed), the 294 bolt MUST be replaced immedi-
ately! Do not use the coupling until the bolt has
been replaced. In addition, carefully inspect the
690 coupling, drawbar, drawbar eye, front end as-
sembly, and tail board for damage. Failure to do
so may result in trailer separation from the truck
while in use, resulting in serious personal injury
or property damage.
The time-in-service of the 294 bolt located in the 690
coupling must be monitored, and maintenance per-
formed as follows. See
Fig. 14.
For a new or replaced 294 bolt:
• Record the date of installation.
6 months after installation date:
• Remove the 294 bolt. Using dye penetrate or
magnetic particle testing along the length of the
bolt, inspect for fractures.
• If the 294 bolt has no damage, install it and
continue to use for another 6 months.
• If the 294 bolt is fractured, DO NOT USE. Con-
tact Premier Mfg. Co.
1 year after installation date:
• Regardless of service duty, replace the 294 bolt
with a new one.
1
2
3
f310313a
07/13/2010
4
1. Linch Pin
2. Handle
3. Pintle Hook
4. 294 Bolt
Fig. 14, Premier 690 Trailer Coupling
Frame and Frame Components31
Century Class Trucks Maintenance Manual, August 201131/10










