Specifications

2-10 Overview: read me first
System operations within comprehensive upgrade
Standard 1.0 System Installation and Modification Guide January 1998
Language expansion increases the number of languages
on a system up to a maximum of four.
A current keycode that supports more languages than are
installed on your system can be used to increase the
number of languages to the keycode maximum.
If you plan to expand languages but your current system
has the maximum installed, a new keycode is required.
Platform migration
The following points apply to platform migration within a
comprehensive upgrade:
A platform migration requires a new keycode.
When the migration is complete, the target platform will
have the identical serial number, storage hours, optional
features, and languages as the original system.
For the migration of mailboxes and applications to
succeed during a platform migration, the target platform
must have at least as many nodes, and the same size or
larger disks, as the original system.
Migration within MM12
The following table provides information about the steps
required for a platform migration within a comprehensive
upgrade.
Starting platform Ending platform Required to perform
Modular Option EC-MMP40 Backup *1
Restore *2
Comprehensive
upgrade *3
Shelf Option EC-MMP40 Backup *1
Restore *2
Comprehensive
upgrade *3
Shelf Option Modular Option Backup *1
Restore *2
Comprehensive
upgrade *3