- Excel / Meridian Data Computer Drive User Manual

SECURSTOR ASTRA ES 129
Reported Event
Corrective Action
Synchronization
Synchronization is started
Result of settings or user action. Normal.
Synchronization is
completed
Normal.
Synchronization is
paused
Synchronization paused because of user
intervention, schedule or higher priority background
activity.
Synchronization is
resumed
Synchronization has resumed again after a pause or
a reboot.
Synchronization is
stopped
Synchronization stopped because of user
intervention, schedule or the logical drive was
deleted or went critical or offline.
Synchronization is
aborted due to an internal
error.
System resources are low. Reduce system load or
restart the Astra ES.
Synchronization is
queued
Synchronization is already running on another logical
drive in the same array.
Synchronization is
stopped internally
Synchronization stopped because the disk array was
deleted or removed.
(Synchronization Events)
Reported Event
Corrective Action
System (Astra ES)
The system is started
The Astra ES has been started.
The system is stopped
The Astra ES was shut down.
(System Events)