- Meridian Controlled Routing Installation And Upgrade Guide

viii Contents
553-3202-210 Standard October 1998
Chapter 7: Unpack and inspect hardware 115
Receiving the IPE Module and Application Module
components 116
Unpacking the IPE Module and Application Module
components 117
Chapter 8: Hardware installation procedures 119
Installing the IPE Module 120
Installing the Application Module 125
Installing the power supply and disk/tape unit 127
Checking the card option settings (Application Module) 129
Installing an NTAK02 SDI/DCH card 142
Installing an ESDI or MSDL card 145
Chapter 9: Meridian Link/CCR interface cabling 151
IPE Module cabling 151
IPE Module cables 151
External I/O cables 154
External I/O cable pinouts (IPE Module) 155
Cabling the Option 11 IPE Module to external equipment 177
Cabling to external equipment 177
Backplane cable rerouting for Options 21Ð81 CE/PE and IPE
backplanes 185
Backplane cable rerouting for the NT8D11 CE/PE Module
backplane 187
Backplane cable rerouting for NT8D37 IPE Module 195
Cabling the Options 21Ð81 IPE Module to external equipment 209
Application Module cabling 216
Power cables 216
Input/output cables 219
Cabling the Application Module to external equipment 227
Installing Ethernet LAN support 256