- Meridian Controlled Routing Installation And Upgrade Guide
Chapter 9: Meridian Link/CCR interface cabling 205
Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide
Table 69
NT8D37 cable connections (segment 0 has been rerouted) (continued)
I/O panel connector
port
Backplane cable
connector
Backplane slot
location
L L-1 L9-1
L-2 L9-2
L-3 L10-1
M M-1 L10-2
M-2 L11-1
M-3 L11-2
R R-1 L12-1
R-2 L12-2
R-3 L12-3
S S-1 L13-1
S-2 L13-2
S-3 L14-1
T T-1 L14-2
T-2 L15-1
T-3 L15-2
Note: Connector ports C, H, N, and U are not used in this configuration.
Ñ end Ñ