- Meridian Controlled Routing Installation And Upgrade Guide
xii Contents
553-3202-210 Standard October 1998
Chapter 15: Link configuration 479
Default configuration 479
Link 0ÑApplication Module Link 479
Link 1ÑX.25 protocol 480
Link 1ÑTCP/IP host link protocol 481
Link 2ÑMeridian Mail Link 481
Changing your configuration 482
Procedure 12: Verifying the link status 483
Procedure 13: Changing AML (link 0) parameters 484
Procedure 14: Changing Meridian Link (link 1) parameters 489
Procedure 15: Changing Meridian Mail Link (link 2)
parameters 497
Procedure 16: Replacing the default configuration file 499
Procedure 17: Creating a configuration file 500
Chapter 16: Additional application configuration503
Procedure 18: Turn off auto-start 505
Procedure 19: Change the Meridian 1 customer number 506
Procedure 20: Schedule regular backups 507
Procedure 21: Change the default system languages 509
Procedure 22: Configure terminal ports 511
Procedure 23: Configure printer ports 513
Chapter 17: Hardware upgrade 517
To upgrade an Application Module SBC card from an
MVME147 card to an MVME167 card 517
To upgrade an Option 11 IPE Module to an Options 21Ð81
IPE Module 517
Procedure 24: Software powerdown 518
Procedure 25: Hardware powerdown 520
Procedure 26: Upgrading the Application Module from an
MVME147 card to an MVME167 card 521
Procedure 27: Upgrading an Option 11 to an Options
21Ð81 IPE Module 522
Procedure 28: Installing the cables for Ethernet LAN
support (Application Module) 524
Procedure 29: Installing the MVME332XT or
MVME332XTS ACC card 526