User manual

Introduction : Synchronizing VCube Essentials with Pyramix
Page 15
Clock Master
•TC Master
•Lock
4. In the Pyramix Client verify that the Chase check box is off
5. In the VCube client verify that the following check boxes are checked on:
•Lock
•Chase
6. In the VCube Client verify that the following boxes are checked off:
Clock Master
•TC Master
Note: Note: Take special care to always use the same TimeCode base in both Pyramix and VCube
to insure proper synchronization through VT. I.e.: 25 to 25, 29.97 to 29.97, 23.98 to 23.98 etc.
VT cannot synchronize Pyramix and VCube if they do not have the same frame rate. Any change in either Pyramix
or VCube alone to a new frame rate will automatically change VT to match but not the other program that has not
yet been changed so remember to change them both.