User manual

Introduction : Synchronizing VCube Essentials with Pyramix
Page 14
VCube Checklist for Synchronization
1. Launch VCube Essentials
2. In the Settings page open the Format & Sync Tab
3. Scroll down to the Synchronization section and check the Follow VT button to activate it
4. Un-check the VCube as VT Clock Master button
Virtual Transport Checklist for Synchronization
1. Open VT from the Windows Task Bar (it will be hidden in the notification area by default under Windows 7 so
click on the tiny triangle in the bottom right side of the task bar to show the hidden VT icon)
2. Click on the Client button (yellow CL)
3. In the Pyramix Client verify that the following boxes are checked on:
VCube Settings page : Format & Sync Tab
VT - Client pane