Specifications
New Shimming procedure
(continued)
• Step 15) The next step will be to install the clamp block and handle
assembly onto the end of the U-joint stub tool on the Pinion
gear and bearing pack tightening it lightly at this point, just
enough to keep the tool from coming off of the shaft.
• Step 16) Now install the dial indicator holder rod into the top stud hole
of the driveshaft housing and tighten the nut.