Installation manual
200/225 OPTIMAX DTS
Page 14 / 42 90-10234050
• Control Area Network (CAN) link harness - Must be installed between command
module harness for dual engine installation.
a
3769
b
c
d
e
f
a - 14 pin data harness
b - Vessel sensor harness
c - Battery cables
d - CAN link harness (dual engine
application)
e - DTS power harness
f - 5 Amp fuse
Connecting 14 Pin Data Harness - Single Engine
SINGLE HELM
IMPORTANT: Avoid sharp bends in the harness. Minimum bend radius should be 7.6 cm
(3 in.).
a
b
3619
a - 14 pin data harness b - Clamp or cable tie