Specifications
3 | Page
TABLE OF CONTENTS
SAFETY AND WARNING INFORMATION 2
SPECIFIC REQUIREMENTS FOR THE COMMON WEALTH OF MASSACHUSETTS 5
FV-41 FULL VIEW GAS FIREPLACE DIMENSIONS 6
TECHNICAL SPECIFICATIONS FOR FV-41 7
MINIMUM CLEARANCES TO COMBUSTIBLE CONSTRUCTION 7
MINIMUM COMBUSTIBLE ROUGH FRAMING DIMENSIONS 7
CONGRATULATIONS 8
BUILDING PERMIT AND INSTALLATION INSPECTION APPROVAL REQUIREMENTS 8
GENERAL APPLIANCE SPECIFICATIONS 9
MANTEL CLEARANCES 9
CLEARANCES TO COMBUSTIBLES FROM APPLIANCE SURFACES 11
PLANNING THE INSTALLATION 12
SELECTING APPLIANCE LOCATION 12
ROUGH FRAMING DIMENSIONS 13
CONSTRUCTING THE APPLIANCE CHASE 13
FRAMING DEPTH AND FINISHING GUIDES 14
FINISHING GUIDES 14
INNER GUIDE 14
OUTER GUIDE
14
FINISHING MATERIALS INSTALLATION 15
TILES AND FAUX ROCK 15
MARBLE AND GRANITE SLABS
15
HEARTH PROTECTION PAD REQUIREMENTS 16
GENERAL INFORMATION 17
SAFETY AND STRUCTURAL CONCERNS 17
VENTING REQUIREMENTS 17
HEATING PERFORMANCE 17
AESTHETIC CONSIDERATIONS 17
ELECTRICAL REQUIREMENTS 17
REMOTE CONTROL RECEIVER LOCATION AND MOUNTING REQUIREMENTS
17
GAS SUPPLY REQUIREMENTS 18
GAS SUPPLY LINE SIZING 18
GAS PRESSURE CHECKING REQUIREMENTS
18
GAS PRESSURE REQUIREMENTS 19
GENERAL INSTALLATION INSTRUCTIONS 20
HIGH ALTITUDE INSTALLATION INFORMATION 20
BLOWER OPERATION 20
OPERATION DURING POWER OUTAGES 20
BACKUP BATTERIES 20
GENERAL FLUE VENTING INSTRUCTIONS 21
COMPONENT "TWIST-LOCK" CONNECTION PROCEDURE 21
EXTERIOR VENT LOCATIONS AND RESTRICTIONS 22
FLUE VENTING COMPONENTS IDENTIFICATION 23
FV-41 MASTER FLUE VENTING REQUIREMENTS CHART 24
IMPORTANT VENTING CONFIGURATION NOTES 25
MAXIMUM HORIZONTAL RUN 25
MAXIMUM VENT SYSTEM LENGTH 25
HOW TO CALCULATE THE VENT SYSTEM LENGTHS 25
USING 90
0
(/%2:6,1=21(³%´ 25
USING 90
0
(/%%2:6,1=21(³$´ 25
USING 45-DEGREE ELBOWS
25
APPROVED VENT SYSTEMS 26
ZERO RISE HORIZONTAL TERMINATION 27
VERTICAL RISE HORIZONTAL TERMINATION 28
VERTICAL THROUGH-THE ROOF VENTING 30
VERTICAL THROUGH-THE-ROOF VENTING USING FOUR 90
0
ELBOWS 32
TO REMOVE DOOR 33
TO REPLACE DOOR 33
INSTALLATION CHECK OFF LIST 34
LIGHTING CHECK OFF LIST 34
BLOWER SYSTEM INFORMATION 35










