Installation Instructions

Set up your materials in a well-ventilated area. In a
large bucket, mix up the concrete following the
manufacturer’s instructions. Use a drill to ensure that
the concrete is evenly mixed. Be sure to wear safety
glasses, gloves, and a dust mask while mixing the
concrete.
STEP 1: Mix the concrete
Spray the inside of the large bowl and the outside of the
small bowl with non-stick cooking spray. This will help
release the concrete once it has dried.
STEP 2: Spray the Bowl
Using the trowel, add concrete mix to the large bowl, lling it 3/4 of
the way full. Level out the concrete with your mixer. Once there are
no more bubbles rising to the surface, press the small bowl straight
down in the center of the concrete, pushing downwards until it is
fully inside the larger bowl. Add weight inside the small bowl to hold
it in place. Then, tap the outside of the large bowl with a hammer to
even out the mix and use your sander to sand the edges to remove
any air pockets that may have formed. Let it sit for 48 hours.
STEP 3: Set the Concrete
Once the concrete has fully set, remove the small bowl.
Carefully ip the large bowl and lift it off the concrete. If
needed, tap the bowl gently with a hammer in order to
loosen the concrete.
STEP 4: Remove the bowl
Drill a hole in the bottom of the large concrete bowl to let
rain water drain
STEP 5: Drill the Bowl