Installation Instructions

Step 3: Leg assembly
Starting with a 1/2-inch floor flange, securely screw an 8-
inch pipe into the threaded end of the flange. Attach a 1/2-
inch tee to the other side of the pipe, followed by another
8-inch pipe and another floor flange. Repeat this assembly
for the other three legs.
Step 4: Begin frame assembly
Lay out the two legs that you just assembled. Screw a 10-
inch pipe into the open end of the tee on each leg. Connect
the two legs by attaching another tee; repeat this step for
the remaining two legs.
Step 5: finish frame assembly
Now you should have two sets of U-shaped legs. Connect
them using a 36-inch pipe. Now your frame assembly is
complete.
Step 6: attach wood surface
Lay down the 48-inch wood surface and center frame
assembly on top. Using #10 x 5/8” wood screws, attach the
frame through the 1/2-inch floor flange into the wood
surface. Attach at each corner. Flip the table over.
Step 7: apply clear finish
Wait at least 3 hours for the stain to dry before applying a
clear coat. Using a clear-finish brush, apply a clear coat to
the top and side surfaces of the wood. Brushstrokes should
go with the grain of the wood. Allow time for the clear coat
to dry and your industrial pipe coffee table is complete!
FOR MORE EASY HOW-TO PROJECTS, VISIT MENARDS.COM
®