Installation Instructions
FOR MORE EASY HOW-TO PROJECTS, VISIT MENARDS.COM
®
With the pilot holes made in step 6, drill the side panels of
the box on with four screws for each side. Position box
front on top of shelf and hold in place. Mark lines where
the panels meet with a pencil. Drill two pilot holes 1 inch
from outer edge and between mark and board edge.
Secure the front panel with four wood screws.
Apply stain over all the wood pieces according to
manufacturer’s instructions.
STEP 9: stain
Attach the numbers using a drill.
STEP 10: attach numbers
STEP 8: attach side & front panels