Installation Instructions
PREPARE:
PILLAR DIMENSIONS
TABLE OF CONTENTS
Level 1 - Level 4
Materials List
Tool Check List
Foundation Guidelines
ASSEMBLE:
Level 5 - Level 8
Level 9 - Level 12
Level 13 - Level 15
Finished Elevations
ENJOY:
Use and Care Instructions
2
3
3
5
6
7
8
9
10
3’ 4-1/2”
1’ 9”
1’ 2”
4
PREPARE
TECHNIQUES
Fasten each layer of block together with
1/4” - 3/8” bead of construction adhesive
on all adjacent block faces unless otherwise
noted. Refer to the construction adhesive’s
application instructions for proper use.
Follow suggestions on page 3 to build a proper foundation before starting your new project. If not
already set, place the rst level of block 1”- 2” below grade, level and ll in any gaps. Use Level 1
as a reference to place the blocks for all remaining levels.
Refer to the illustrations on the following pages to guide you through each step. Prior to adhering
each level to the previously laid block, place the entire level of blocks and check to make sure it
ts properly. Remove small sections at a time to place the adhesive.
Let adhesive dry for a minimum of two days.
INSTALLATION INSTRUCTIONS
* Do not over apply adhesive. It may reduce effectiveness.
Use mineral spirits to remove any unwanted adhesive.