Owner`s manual

VG0969_B1 2/14/13 8
Installation Step 2
1. ROUTE THE CONTROLLER AND ITS CABLE THROUGH THE CONTROLLER CABLE WAY IN THE
ISLAND.
2. PLACE THE UNIT INTO THE ISLAND, AND POSITION IT TO THE DESIRED DEPTH. ENSURE THAT
THE VENT HOLES IN THE SUPPORT BRACKETS ARE UNOBSTRUCTED.
3. LOCATE THE TWO MOUNTING HOLES FOUND IN THE BACK OF THE LEFT AND RIGHT SUPPORT
BRACKETS (ITEMS 12 & 25), AND MARK THE HOLE LOCATIONS ONTO THE ISLAND’S
COUNTERTOP.
4. CAREFULLY SLIDE THE UNIT OUT OF THE
ISLAND, EXPOSING THE MARKED HOLES ON
THE COUNTERTOP.
5. DRILL TWO 5/16” HOLES INTO THE
COUNTERTOP USING A DRILL BIT
APPROPRIATE FOR THE MATERIAL OF THE
COUNTERTOP.
6. INSERT TWO CONCRETE ANCHORS (ITEM
32), INTO THE TWO 5/16” HOLES.
7. SLIDE THE UNIT BACK INTO POSITION,
LINING UP THE MOUNTING HOLES IN THE
LEFT AND RIGHT SUPPORT BRACKETS WITH
THE CONCRETE ANCHORS.
8. FASTEN THE UNIT INTO PLACE USING THE
TWO 1¾” LONG STAINLESS STEEL SCREWS
(ITEM 33). DO NOT OVERTIGHTEN.