User`s guide

1. If not already running, start the process units as described in their respective
manuals.
2. Start the remote communication equipment, modems, etc.
3. Start the printers by switching the power on.
4. Switch on the workstations, so that MicroSCADA monitors can be opened
automatically.
5. Start the base systems. If there are hot stand-by (redundant) base systems, start
both the hot and stand-by base systems.
6. Start the communication frontends. If there are redundant frontends, start both
the hot and stand-by frontends.
7. Open the MicroSCADA monitors that are not opened automatically.
8. Log into the application.
During the installation of the SYS 600 software, a MicroSCADA Control System
SYS 600 icon is created, in which you will find links to available tools. Refer to the
Fig. 3.6.-1 given below.
A070495
Fig. 3.6.-1 Links to available tools
In addition to MicroSCADA kernel software, two empty applications named
TUTOR and WD are also created. You can verify the start of
MicroSCADA SYS 600, MicroSCADA and SYS 600 Pro Monitor without any
further editing, by opening the SYS 600 Notify window shown in Fig. 3.6.-2 to see
information messages and the possible reasons for failure.
Software revision information is available in the Notification Window.
134
SYS 600 9.2SYS 600 9.2
MicroSCADA Pro
Installation and Administration Manual
1MRS756115