User's Manual
Table Of Contents
- Table of contents
- List of figures
- CHAPTER 1 Description
- CHAPTER 2 Indications and contraindications
- CHAPTER 3 Personal Pump Communicator (PPC)
- CHAPTER 4 Pump implantation
- Preprogramming and pre-testing the Pump
- CHAPTER 5 Pump refill procedure
- CHAPTER 6 Explanting the Pump System
- CHAPTER 7 Warnings and precautions
- CHAPTER 8 Adverse reactions
- CHAPTER 9 System alarms and messages
- Pump alarms
- Alarm feedback
- Pump low battery
- Depleted pump battery
- System error
- Pump self test fail
- PPC low battery
- PPC alarms
- Low reservoir
- Empty reservoir
- Telemetry communication error
- Initialize alarm
- PPC not initialized
- Battery replacement
- Initialize to factory defaults
- Pump stopped
- Pump suspended
- Auto off
- Hourly maximum exceeded
- Pump alarm table
- Pump alarms
- CHAPTER 10 Troubleshooting Pump System under-delivery
- CHAPTER 11 Technical specifications
- APPENDIX A Label information symbol dictionary
- APPENDIX B Implant worksheet
- APPENDIX C Refill form
- APPENDIX D Precautions and general procedures
- APPENDIX E Pump rinse procedure
- APPENDIX F Side Port Catheter flush procedure
- Supplies and solutions
- Preparing for the procedure
- Flushing the Side Port Catheter
- Program minimal basal rate
- Remove insulin and fill with rinse buffer
- Equilibrate and pull rinse buffer through system
- Flush side port catheter
- Remove rinse buffer and fill with insulin
- Equilibrate and pull insulin through system
- Remove guide needles and record refill amount
- Program new basal rate
- Remove rinse buffer from catheter
- APPENDIX G Stroke volume measurement
112
Accessing the pump inlet
(See Figure 16.) To enter the Pump fill port or the side port, make sure the refill
syringe stopcock is closed, then pass the Medtronic MiniMed refill needle
(MMT- 4102) through the 18 gauge guide needle. Pull back slightly (approxi-
mately 2 mm) on the guide needle to allow the Medtronic MiniMed refill needle
to enter the Pump fill port or the side port. The refill needle entry opens the inlet
valve of the Pump fill port.
After passing through the septum and seating in the valve, you can feel the
increased force, about 0.5 pounds, required to move the valve 0.5 millimeter to
open. Maintain this downward pressure in the pump fill port to ensure that the
inlet valve remains open. In the case of the side port, a downward pressure is not
required after the needle is completely inserted.
Figure 16: Inlet valve