Manual Part 2

92
Step 7 Verify the Catheter is securely attached to the Pump.
Look into the connector and observe the position of the
locking bar with respect to the Pump connector outlet.
Check the side port connector hub for abnormalities
(e.g., cracks, misalignment.)
Step 8 Using the IN2 refill syringe, enter the Catheter side port
cone and push a small amount of INSULIN out the Cath-
eter tip. Verify that no insulin flow is observed at Pump/
Catheter interface. Remove and reseat Catheter if flow is
noted. Remove the syringe.
Step 9 Confirm insulin delivery from the tip of the Catheter and
note it on the Implant Worksheet. The INSULIN will
form a dome on the tip of the Catheter. Pulsatile delivery
will not be obvious. If the priming bolus has already
ended, program an immediate bolus (about 20 units) to
confirm delivery. (This bolus may be canceled after
delivery is verified.)
Step 10 At the end of the bolus, rinse the outside of the Pump
thoroughly with sterile water to remove traces of
INSULIN. The Catheter tip should not be placed in the
water. Protect the Pump with sterile drapes until the sur-
geon is ready to implant it. Verify that the priming bolus
is finished or canceled prior to the implantation.
The Pump and Catheter are now ready for implantation.
Dmp9196021-011_c.book Page 92 Wednesday, April 3, 2002 5:04 PM