1 Table of Contents Features & Technical Specifications...................................................................................................................... 2 General Installation instructions ........................................................................................................................... 6 Installation in a three-phase panel .......................................................................................................................
2 Features & Technical Specifications Meazon has developed “DinRail Cerberus”, a 3-Phase electricity meter capable of remote monitoring and controlling energy consumption of a household and/or an industrial building. It is a wireless metering system based on ZigBee Mesh network technology, featuring a unique design that combines low cost and high accuracy measurements. Every metering device on the ZigBee network is associated with a ZigBee gateway.
3 Mechanical and Environmental Specifications Power Consumption 5VA Dimensions (WxHxD) 36 X 100 x 87,8 mm Mass 0.
4 FCC Information This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.” NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules.
5 Meazon DinRail Cerberus Meazon Electronic Systems S.A., 57 N.E.O Patron - Athinon Str. 26442, Patra, Greece info@meazon.com support@meazon.com +30 2610 430000 www.meazon.
6 General Installation instructions INSTALLATION REQUIREMENTS The instructions provided below, should be performed only by licensed electricians. Installation from nonqualified individuals may lead to electrocution or heavy damage to the devices. Wiring requirements: 16 or 18AWG Solid cable. Make sure that the maximum amperage to be measured does not exceed the maximum value the provided Meazon DinRail Cerberus can measure.
7 CTs installation • • • Connect each of the three Current Transformer’s outputs (black wires) to contacts CT1 B, CT2 B and CT3 B. Connect each of the three Current Transformer’s inputs (red wires) to contact CT1 R, CT2 R, and CT3 R. Locate the current conductors to be measured starting from phase L1 and pass it through the coil of the CT (current transformer) by opening the coil of CT. WARNING! Make sure the direction of the arrow illustrated at the CT terminals to the load.
8 Upon completion of the electrical installation of DinRail, the electrical panel should appear as below: Electrical Panel with DinRail Cerberus in a 3-Phase Panel Meazon Electronic Systems S.A., 57 N.E.O Patron - Athinon Str. 26442, Patra, Greece info@meazon.com support@meazon.com +30 2610 430000 www.meazon.
9 Disclaimer • The material in this manual is for informational purposes only. The products it describes are subject to change without prior notice, due to the manufacturer’s continuous development program. • Meazon S.A. shall not be liable for any damages, losses, costs or expenses, direct, indirect or incidental, consequential or special, arising out of, or related to the use of this material or the products described herein. About Meazon Meazon acts as a catalyst to the energy efficiency market.