Installation Guide

8
Meazon Electronic Systems S.A., 57 N.E.O Patron - Athinon Str. , 26442, Patra, Greece
info@meazon.com support@meazon.com +30 2610 430000 www.meazon.com
Installation in a single-phase
Panel
WARNING! You can measure up to three (3) different loads.
To do this, follow the instructions of 3-phase installation
above. The terminals 1(L1) 2(L2) - 3(L3) must be bridged
when the device is installed on single phase panel even if
only one CT is used.
Electrical Panel with DinRail 3-Phase Advanced NB at
Single-Phase Panel